SDU Modular MBB
Technical specifications of the model
Available for Sentinel Dual SDU models from 5000 to 10000 VA.
- Rack/tower configuration
- Same UPS and Battery cabinet Look&Feel
- It can parallel up to 3 UPS units
- Simplified installation
- Hot-swap connection for each UPS
- The manual bypass switch is protected under the plastic front cover
Up to 3 Sentinel Duals can be operated in parallel in either capacity or N+1 redundant configuration offering increased reliability for critical system.
The kit permits hot-swap operation for any connected UPS and maintenance bypass for the entire parallel system.
There are available 2 different options:
- 1 ph 50 A, 3 connectors kits
- 3 ph 18 A, 3 connectors kits.